Below is a list of the most common "Site Improvements"
and their average cost:
| Site Improvement |
Developed Lot |
Un-developed Lot |
|
Building Permit
|
$350 |
$350 |
|
Sewer Tap Fee
|
$400 |
N/A |
|
Soil Test
|
N/A |
$290 |
|
Septic Permit/Design Fee
|
N/A |
$400 |
|
House Staking/Plot Plan
|
$800 |
$950 |
|
Temporary Construction Drive
|
$550 |
$850 |
|
Culvert (if required)
|
$405 |
$565 |
|
Temporary Electric Pole Rental
|
$260 |
$260 |
|
Backfilling Crawl Space Home
|
$465 |
$465 |
|
Backfilling Basement Home
|
$950 |
$950 |
|
Rough Grading Yard
|
$465 |
$465 |
|
Sidewalk to House and Concrete Driveway
|
$4,500 |
$5,500 |
|
Well and Pump
|
N/A |
$4,000 |
|
Connection to City Water
|
$800 |
N/A |
|
Septic System
|
N/A |
$6,000 – $9,500 |
|
Septic Perimeter Drain (If Needed)
|
N/A |
$2,500 |
|
Additional Dirt to Cover Septic (If Needed)
|
N/A |
$2,000 |
|
Connection to Sanitary Sewer
|
$800 |
N/A |
|
Final Grade, Straw and Seed
|
$1,200 |
$1,750 |
| Clean Up Debris/Dumpster Rentals |
$1,980 |
$1,980 |
|
|